During the spring term of 2011 there were a number of exciting new developments in the school grounds.

  • The Adventure Trim Trail had been installed
  • The Foundation Stage Shelter had been constructed
  • The Cycle/Parent shelter had been constructed
  • The PE Shed had been constructed.

Our grateful thanks must go to all the adults and children who have given their time freely over the term, they really have made such a difference.

The Adventure Trim Trail has been funded through two separate grants and is now available for all the pupils to use.

The cycle shelter has been made possible through the grant awarded to the school for the sucessful completion of a school travel plan, that will not only be really useful for bikes, but also for sheltering from the rain when waiting for children.

With a substantial amount being received in the form of grants, fund raising and Tesco vouchers, a new PE shed has been constructed and filled with a host of sporting equipment.

OLYMPUS DIGITAL CAMERATrim trail complete

 

The Adventure Trim Trail under construction and in use.

OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA

The PE shed under construction and complete.

OLYMPUS DIGITAL CAMERAOLYMPUS DIGITAL CAMERA

The Cycle shelter under construction and very nearly complete.

//*/